Steel structure Dormitory & office in Thailand is the multistorey steel frame ,the whole steel frame just use the steel beam.The floor is use the floor decking steel sheet and concrete to do.It will be bigger usage space than traditional concrete building. The installation time is shorter than concrete building.Steel structure Dormitory & office in Thailand just need 2 months time to installation.During the installation there have no any dust,and have no superabundance trash.This is the environmental building,the steel structure Dormitory is 3 floor high and the steel structure office is the 7 floor high,the total area is 6697 square meter.
Thailand dormitory and office steel structure hang pile picture
Thailand office and dormitory steel frame overall picture
Thailand office and dormitory steel frame completion picture