Discuss usually steel roof leaking problem

Time:[2016-3-30]  Hits:5762

Guangzhou Steel News: Discuss usually steel roof leaking problem
Guangzhou Steel tells you: the cause of leaking roof
(1), planning elements
1) "portal frame BOLTED technical specification" provides: portal frame light house roof slope should take 1/8 to 1/20, more rain in the region should take greater value therebetween. In practice, project planning, construction units to save money or for other reasons request to minimize the roof slope, planning units and often die move rigidly prescribed, do not consider the practice situation. Resulting in many of the works of roof slant is too small to form a roof rainwater can not be routed to the gutter, so the roof water to form a roofing seepage scene.
2) planners do not understand the local rainfall also formed the roof slope planning too slow, too small cross-sectional area of ​​gutter important element.
3) the lack of a node planning, construction units randomly selected node practice at the roof parapet high enough, projecting roof duct, the exhaust passage improper orientation or high enough so that the impact of construction difficulties waterproof layer.
4) plate poor choice. For dark button and bite-type plate, as long as the field devices properly, usually do not have much of a problem, but if the use of the kind of direct plate by self-tapping screw connection, even if the scene very well, waterproof glue it mildly, thermal expansion and contraction due to the performance of the panel will show leakage 5) holes in the roof when the ill-conceived plan. Shall not at the construction site just cut holes cut holes, holes waterproof to do!
6) section of color plates envelope too thin. After a period of use, the outer plate corrosion or affected by temperature increases the gap between the deformed plate.
(2), the construction elements
1) construction project to pay attention to protect the roof envelope, free to stampede roof, flat roof or even undermine the presentation crack sealant did not hit the volume, orientation is not in the correct place, Tarlac rivets too much and is not waterproofed deal with.
2) Gutter not be preserved. Gutter corrosion construction unit just some rust or asphalt paint brush, use for some time, gutter serious corrosion.
3) Steel plant roof span is too large due to the presence in many cases the roof overlapping process, although the use of overlapping, etc. 138 900 polyurethane sealant and staples and other processing equipment is often difficult to achieve the standard planning theory, lead to leaking.
4) there is no gutter lateral inclination. Leaving a certain slope should be made, at least 0.5%.
5) key node sloppy construction site. Parapet and other root without the required shade angle or circular arc made too small, closed head side coil end Mifengbuyan, catchy white metal deformation, coupled with scarce fixed-point data seal seal well. Roots protruding roof pipe plugging holes lax pipeline four weeks was up close to leveling layer no leveling layer, waterproof layer pan of water high enough. Insulation construction rain, exhaust ducts blocked vent unreasonable to form a long-term immersion insulation. Rigid roof cracks split seams and sew side wall waterproof sealant bond is not strong seepage.
(3) using the elements 1) Housing feel free to add them in the course of loading, causing roof deformation. Especially when the roof purlins free to add load, purlin deformation, resulting in roof water.
2) waterproof glue, sealant aging, use project lacked the necessary protection.
Leak-proof way
(1) should be strictly in accordance with specifications planners plan can not be arbitrarily decreased because of the cost savings plan target, planners should be more to the construction site, contact the practice of planning.
(2) planning should be made based on detailed and reasonable practice of a large sample of nodes, not just convenience, blindly applied on the node graph membership. Planners in the planning of the roof purlins when conservative should not blindly in order to save steel, while the drop height purlins. Purlin height a little higher, it is conducive to leak.
(3) should be better waterproof roof plate type. According to market research statistics, 760 Field composite panels, 475 color plates, 675 color plates, engaging at least 360 ° 180 °, almost no leakage phenomenon, although these types of plate means more trouble, but reflect with good effect.
Select (4) roofing materials, should use the quality of trust manufacturers. Since the properties of the metal roof of the data should be used for the metal plate roof waterproof materials; such as having high bond strength, good conformability, excellent weather resistance and butyl rubber adhesive sealing tape, as the metal roofing waterproofing supporting information.
(5) when the device works, site management should be strengthened to improve the quality of the team means the best steel manufacturers raised their own support team or the technical backbone, management backbone to curb power contractors.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美精品人妻福利网址| 日韩无码 91大神| 久久香蕉97| 国产精品久久久久久人妻系列电影| 日本午夜福利免费| 一区二区三区无码高清淫色人妻| 久久久久久久久机进| 丰满娇妻久久久| 日本少妇六区| 精品视频ww| 麻豆AV成人无码| 日本免费福利区| 大香蕉,www| 亚洲色图国产极品av无码小说区| 午夜福利院在线在线播放 | 亚洲天堂a网| 天天谢天天操天天干| 黄片男插女在线淫荡| 欧美曰韩一级视频| 伊人无码日韩电影| 嗯啊大鸡巴欧美久久久久| 国产精品狂野欧美| 不卡一区日韩| 天天添天天干天天射天天日天天色 | AV午夜大香蕉久久| 夜夜操,天天操,狠狠操| 插鸡巴美女| 欧美二区14p| 欧美图区三区| 国产精品久久人人做人人爽| 夜夜草极品综合精品| 日B手机免费看| 96国产91| 91久在线播放| 大鸡巴操美女52g| 亚洲av成人黄色| 久久五码三级视频| 亚洲永久精品XXNET| 色噜噜日本| 5252AV天堂| 人妻少妇伦伦伦伦伦av|