raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5171

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
婷婷色婷婷91| 青青青青青青色综合| 不卡不卡久久久| 美色阁久久久久久久| xxx成人综合教育网| av成人中文字幕一区二区| 欧美伊人精品成人久久综合97| 天天操天天干天天干天天| 最美少妇综合网| 女爽入逼产区一区二| 黄色福利0| 少妇系列久久| 骚逼电影国产精品久久 | 中文字幕日韩一区二区三区| 亚洲色天香综合网| 国产天堂免费| 无码久久精品无码专区| 天天操天天射天天看| 一区二区三区AV不卡| 人妻中文字幕小说| 一区二区三区四区五区六区AV| 性色avav| 日韩在线影院一区二区| 人妻交换 在线| av电影午夜福利| 欧美性天天在线观看| 污污插进去视频| www国产毛片一区| 日本不卡色中文| 大香蕉资源网8| 日本性插日| 一区二区在线麻豆| 美欧精品一区二区九九九| 欧美综合图片一区视频在线| 性奴调教一区二区| 美欧日本a| 欧美 日韩 亚洲 激情 图文| 毛片特级免费| 美女操B B| 一区二区性感| 人妻无码高清一区|