h无码在线观看,色AV五月,日本免费试看,国内美女内射

Language:CHINESESENGLISH

Home > News > Steel supervision next station control points
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.linbaoquan.cn

Steel supervision next station control points

Time:[2016-1-20]  Hits:5087

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲精品综合视频手机在线观看| 中文字幕抽插亚洲| 免费看日麻| 欧美久久久视频综合| 亚洲精品久久久蜜臀AV蜜桃网| 爽人人精品97亚洲一区| 亚洲一级二级三级精选| 天天天干天天射天天天操www| 欧美日韩精品一区二二区三区| 亚洲综合在线视频| 99午夜夫妻福利视频| 美国久久大香蕉| 无码国产白浆| 欧美性护士视频| 亚洲国际精品一区二区三区| av高清无码观看网址| 欧洲日本午夜在线| 日韩欧美精品A| 在线日韩就要射| 超碰中文字幕日韩| 日韩福利网站亚洲| 亚洲最新理论片| 欧美 一| 熟女久久骚逼大屁股| 中文字幕熟女人妻免费看片软件| .日韩av伦理免费| 日韩一曲久久| 夫妻性生活视频日韩| 欧日成人网站| 久久精品国产欧美国产| 久久久久久久亚洲伦理| 激情999久久久| 精品少妇爆乳一区二区三区| 日韩成人另类一区| 国产精品久久久久久亚洲影视精品| 日韩免熟妇| 欧洲日韩成人| 久久AV秘 一区二区三区水生| 香蕉视频亚洲黄片a| 欧美一区二区日韩一区二区熟女| 精品久久久久久中文幕人妻 |