h无码在线观看,色AV五月,日本免费试看,国内美女内射

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.linbaoquan.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4813

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
,久久久久久无码| 欧美性精品hd| 欧美日韩am无码免费| 亚洲精品国产美女在级| 一级国语黄色大| 日韩黄色免费AV| 久久精品夜视频免费| 亚洲三级偷拍视频| 天天干天天做天天日天天爽| 日韩丝袜人妖调教| 成人色吧一区二区| 无码久久视频精品一区二区| 日韩人妻啪啪丝袜| 亚洲无码中文久久久| 三级视频久久中文字幕| 精品一区乱码水多多| 免费的国产精品| 国语对白亚洲| 91我不卡在线视频| 亚洲熟妇色XXXXX欧美老妇伦| 欧美曰韩_区二区三区一级| 欧洲亚洲欧洲无码视频在线| 日韩美女电影一区| 媚黑欧美亚洲手机在线| 日韩素人精品中文字幕| 亚州F日韩欧美| 欧美成人精品乱码| 国产精品久久久久久高潮液| 欧美日韩国产精华| 日韩免费观看一区二区三区四区| 麻豆电影网站| 亚洲午夜影院2014| 在线国产日韩欧美精品三级| 免费啪啪啪成人精品网站| 国产精品野性欧美| 日本精品一区二区高清不卡| 日韩五码电影| 粉嫩午夜福利| 人妻斩一区三区五区| 日本高清在线不卡一区| 成人美女三级|