1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5131

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
avv成人在线| 日韩se AV| japanese国产无码免费看| 无码精品视频一期二期| 亚洲图片视频一区二区三| 欧美日韩成人直播在线| 久久久天堂影院亚洲婷婷| 国产亚洲不卡影院| 182视频国产免费福利| 成年人不卡视频| 91东北 桃色| 亚洲国产中文午夜精品不卡| 国产超碰9l| 自拍偷拍国产亚洲| 另类熟妇HD老熟女| 五月天激情成人图片| 亚洲综合色成在线播放| 亚洲视屏色诱| 日本少妇精品一区| 婷婷五月天亚洲无码| 久久社区大奶美女| 大鸡巴操逼在线观看| 9国产日本三级爽| 欧美亚洲黄片一区| 精品一区二区视频图片网| 精品欧慕日韩中文字慕在线一区| 青青青青青青青操福利视频| 18禁黄色美女视频| 日日夜夜国产第一| 亚洲高清AV无码电影| 在线观看超清二区av| 极品夜夜干| 国产欧美日韩五月天| 亚洲日本欧美综合| 国产女同系列8汁水横流| 中国大陆国产av一区二区三区| 久久精品国产V欧美V亚洲| 无码中文字幕人妻无码| 台湾三级麻豆| 美曰韩一级黄片| 黄色网ihg|