h无码在线观看,色AV五月,日本免费试看,国内美女内射

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.linbaoquan.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5499

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
色好看久久| 国产麻豆91欧美一区二区| 东北熟女操逼视频| 欧美性爱高清无码| 亚洲国产精品福利网站| 在线观看不卡av网址直接播放| XXXsXXY成人| 日韩三级4K| 亚洲精品狠狠操| 天天干天天久天天日| 人人人操人人| 国产精品四季影视| 嫩草av一区二区久久| 国产黑丝啪啪啪| 色综合久久88一加勒比| 日韩一区二区免费在线| 97色福利| 韩国欧美日本无限看| 超碰05麻豆| 综合久久一本| 日韩av小说在线| 黄AV无| 日本在线视频精品| 欧美熟妇第一页| 天天操夜夜操天天插| 亚洲一区二区三区四区五区六区| 亚洲97PORN在线看| 亚州精品福利| 国产一区二区手机无码在线看| 性东北性午夜生活| 码在线观看一区| 国产丰满人妻一| 亚洲偷拍综合图区| 欧美日韩无码中文字幕一区二区| 665566综合无码| 免费伦理成人黄色av| 香港黄色三级片久久久| 亚洲精品自拍偷拍第一页| 久久99久久88精品国产| 亚洲天堂红桃av| 国产欧美日韩高清观看|