亚洲国产精品无码久久98温泉中出,xxx日本在线播放,人妻字幕,综合精品一区

Language:CHINESESENGLISH

Home > News > Technical preparation of steel structure device
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://

Technical preparation of steel structure device

Time:[2014-9-6]  Hits:4296

Technical preparation of steel structure device

Technical preparation Foshan Steel unit mainly includes the following points:

① should strengthen the close conjunction with planning units.

Careful review of the drawings, the intent and understanding of the technical requirements planning, combined with the technical conditions of the construction unit to ensure that the possibility of the implementation plan drawings, reducing the figure after planning changes.

② understand the situation, grasp the climatic conditions.

Steel structure devices typically are treated as sub-projects, and thus, on-site construction site conditions can be stacked components, machinery and transport equipment into the playing major conditions, water supply and fire power facilities, temporary space conditions, the demand for a comprehensive understanding, unified planning; addition, the natural climatic conditions, such as temperature, wind, humidity and all seasons to understand climate change, in order to take appropriate technical measures to better prepare the organization planning the construction of steel structure of the device.

③ preparation of construction plans.

Should understand and master the general contracting construction organization planning and construction units on the basis of the preparation of the ground structure and construction of underground structures, the main structure and podium construction, construction and renovation, equipment, construction and other arrangements, the merit-based selection of construction methods and construction machinery . Needs to take on new materials, new technology, organizational strength should be carried out trial tests (such as the thick steel plate welding, etc.).

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號