亚洲国产精品无码久久98温泉中出,xxx日本在线播放,人妻字幕,综合精品一区

Language:CHINESESENGLISH

Home > News > Control purposes tall buildings?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://

Control purposes tall buildings?

Time:[2014-7-26]  Hits:4358

Control of high-rise building construction intentions?
Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum displacement and displacement to be controlled, the main intent of the following:
1, to ensure that the basic structure of the body in elastic stress state, to prevent cracks in the concrete wall studs, floor slab crack control number, width.
2, ensure the integrity of infill walls, walls, walls and other non-structural components, to prevent significant damage.
3, the regularity of the control plane configured to avoid the formation changes, adverse effects on the structure.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號