Key Points of Column Installation in Steel Structure Workshop Construction

Time:[2022-12-24]  Hits:3866

The steel column is one of the main components of the steel structure plant. As its name implies, the steel column is a column made of steel. There are two types of section forms - solid web column and lattice column. For the steel column device, the component shall be rechecked after mobilization and during installation, and the number, size, shape, connection hole orientation and other attributes shall be consistent with the drawings one by one before the component device construction.

 

 

1. Elevation observation points and center line signs shall be set before the installation of steel column components. For a plant project, the observation points and signs shall be set in the same direction, and shall conform to the following provisions:


First of all, the setting of elevation observation points shall conform to the following provisions: the setting of elevation observation points shall be based on the bracket (shoulder beam) bearing surface, and shall be set at the position convenient for observation of the column; For column without bracket (shoulder beam), the center of the top device hole connecting the column top and the truss shall be taken as the benchmark.


Then, the setting of center line sign shall conform to the following provisions: a center sign shall be set in the direction of the upper line on the surface of the column base plate, and a center sign shall be set on both sides of the line direction; A center line shall be set at the upper line and column line direction of the column body, and a center mark shall be set at the bottom, middle (bracket or shoulder beam) and top of each center line; The double bracket (shoulder beam) column is set with center marks on the outer surface of the two column shafts in the line direction.


2. During the construction of steel structure plant, the multi section column device shall be assembled into a whole and then hoisted.


3. The correction of steel column device shall comply with the following provisions: eliminate the deviation caused by side sunlight; The verticality deviation of the column shall be controlled according to the temperature (season). After the crane beam, roof truss device and crane beam are adjusted, fixed and connected, the steel column shall be retested, and those exceeding the allowable deviation shall be adjusted in time.


4. For columns with large slenderness ratio, temporary fixing measures shall be added after hoisting.


5. The installation of inter column support shall be carried out after the alignment of columns, and the inter column support shall be installed under the condition of ensuring the verticality of columns.


Quality is the life of construction projects. Quality is the first priority in the construction of steel structure workshops. Only quality is the first, can an enterprise have a long term. Only good process methods and correct and reasonable operation methods can ensure the high-quality completion of the project.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
加勒比影视一区二区中出| 国产性生活视频鲁一区| 国产精品99999呀| 潮吹 - 色哟哟| 熟妇视频免费试看| 色欲影视性AⅤ大全| 中文字幕无码免费久久99| 日本亚洲国产精品| 91日本成人片网站| 欧美3D人妻无码第一页| 亚洲特黄一片| 久玖玖久99精品| www啪在线免费| 色欲一区二胎| 人人这里只有精品99| 婷婷久久少妇| 台湾佬免费视频观看| 岳伦一区二区三区四区五区六区| AV天堂一区二区| 欧美高潮喷水在线观看| 成人香蕉视频再线网站| 在线鸭亚洲| 少妇人妻连续中出| 亚洲美女黄色按摩视频在线播放| 人人爽香蕉精品| 母乳人妻中出一区二区| 精品人妻少妇后入狠狠操| 亚州99久久| 久久99精品磨豆| 中文字幕亚洲有码久久| 激情婷婷色人阁| 日本理论片免费观看在线视频| 欧美欧美成人午夜视频在线观看| 国产精品无码亚一区二区三区| 黄色av网址6| 全黄国产AV| 久久天天色| av久久| 亚洲一区二区三区福利| 日韩激情一二三| 麻豆精品在线视频|